Applicant Name: | |
Applicant Address: | |
Subdivision code: | |
Subdivision Name: | |
RR Number: | |
Sanctioned Load / Contract demand: | |
Connection Type: | |
Tariff category: |
@ 2021 - Design by BESCOM
Type of Residential sector | CFA (as percentage of bench mark cost or cost discovered through competitive process whichever is lower) |
---|---|
Residential sector (upto 3kW capacity) | 40% of bench mark cost |
Residential sector (above 3kW capacity and upto 10kW capacity) | 40% upto 3kW Plus 20% for RTS system above 3kW and upto 10kW |
Group Housing Societies/Residential Welfare Associations (GHS/RWA) etc., for common facilities up to 500 kWp (@10kWp per house), with the upper limit being inclusive of individual rooftop plants already installed by individual residents in that GHS/RWA at the time of installation of RTS for common activity | 20% |
Capacity Range * | Benchmark Cost (Rs. per kW) including GST |
---|---|
1kW | Rs.56,041/- |
Above 1kW and upto 2kW | Rs.51,523/- |
Above 2kW and upto 3kW | Rs.50,185/- |
Above 3kW upto 10kW | Rs.48,956/- |
* Capacity will be calculated based on Inverter capacity or the SPV module array capacity whichever is lower. |
Consumer investment portion and CFA amount details for Individual Residential Consumers | |||||||
SRTPV Capacity (kWp) | Awarded price (Rs/KWp) Incl. GST | Total Capacity cost (In Rs) Incl. GST | CFA/Subsidy from MNRE | Consumer Investment (Rs.) | |||
Benchmark cost (Rs/KWp) Incl. GST | Subsidy avaliable for the awarded/Benchmark cost whichever is lower | Subsidy Amt. (In Rs.) | Amt. (In Rs) | Net Metering cost | |||
a | b | c=a*b | d | e | f=c-e | g | |
1 | 56041 | 56041 | 53398 | 40% for 1kW = Rs.21359/- | 21359 | 34682 | To be purchased |
2 | 51523 | 103046 | 49093 | 40% for 2kW=Rs.39274/- | 39274 | 63772 | To be purchased |
3 | 50185 | 150555 | 47819 | 40% for 3kW=Rs.57383/- | 57383 | 93172 | To be purchased |
4 | 48956 | 195824 | 46648 | 40% for 3kW=Rs.55977/- + 20% for 1kW=Rs.9330/- | 65307 | 130517 | To be purchased |
5 | 48956 | 244780 | 46648 | 40% for 3kW=Rs.55977/- + 20% for 2kW=Rs.18659/- | 74637 | 170143 | To be purchased |
6 | 48956 | 293736 | 46648 | 40% for 3kW=Rs.55977/- + 20% for 3kW=Rs.27989/- | 83966 | 209770 | To be purchased |
7 | 48956 | 342692 | 46648 | 40% for 3kW=Rs.55977/- + 20% for 4kW=Rs.37318/- | 93296 | 249396 | To be purchased |
8 | 48956 | 391648 | 46648 | 40% for 3kW=Rs.55977/- + 20% for 4kW=Rs.46648/- | 102626 | 289022 | To be purchased |
9 | 48956 | 440604 | 46648 | 40% for 3kW=Rs.55977/- + 20% for 4kW=Rs.55977/- | 111955 | 328649 | To be purchased |
10 | 48956 | 489560 | 46648 | 40% for 3kW=Rs.55977/- + 20% for 4kW=Rs.65307/- | 121285 | 368275 | To be purchased |
Sl.No | Capacity of proposed SRTPV system | Registration fee Rs. | Facilitation fee Rs. | Remarks |
---|---|---|---|---|
1 | >1kWp upto 5kWp | 500/- + Applicable GST | 1000/- + Applicable GST | Application fee is non- refundable. Facilitation fee is collected only from consumers to whom the feasibility is given. |
2 | >5kWp upto 50kWp | 1000/- + Applicable GST | 2000/- + Applicable GST | |
1 | >50kWp upto 2000kWp | 2000/- + Applicable GST | 5000/- + Applicable GST |
Capacity Range | Type of Bi-directional Meter | M/s Secure M/s Genus M/ Rates Inclusive of taxes in Rs. and Name o | ||||
---|---|---|---|---|---|---|
M/s Secure | M/s Genus | M/ Rates Inclusive of taxes in Rs. and Name of the empanelled Meter Vendors HPL | M/s L&T | Calibration fees of Meter (Payable to GESCOM) in Rs. | ||
Upto 5kW | Single Phase, 2 wire | 2,805 | 2,680 | 2,200 | --- | 200 |
Above 5kW & upto 17.5 kW | Three Phase, 4 wire, Whole current | 6,985 | --- | 6,300 | --- | 1,800 |
Above 17.5 kW & upto 50 kW | Three Phase, 4 wire, CT Operated | 10,076 | 9,700 | 8,500 | --- | 1,800 |
50 kW & above | Three Phase, 4 wire, CT Operated | 21,755 | --- | --- | 22,000 | 2,400 |
sd/- Executive Engineer (DSM) GESCOM, Kalaburagi |